|
A/A |
Company |
Year |
Project |
|
01 |
(Project in
progress) |
10/05 |
Conversion of a Combination
Carrier (OBO) to
Crude Oil/Product Carrier. |
|
02 |
POLEMBROS
|
07/05 |
Feasibility Study for the
Conversion (shortening)
of one Aframax Tanker. |
|
03 |
POLEMBROS |
07/05 |
Feasibility Study for the
Conversion of a single
Aframax Tanker to double hull oil tanker. |
|
04 |
EUROTANKERS |
01/05 |
Conversion from a single hull to
double hull asphalt
carrier at 1700C (14,500
dwt). |
|
05 |
PLEIADES |
10/04 |
Feasibility Study for the
Conversion of Aframax
Tanker (upgrade from Category I to Category II). |
|
06 |
CARDIFF |
04/04 |
Attendance pf the Conversion
of two (2) Aframax
single bottom tankers to double hull oil tankers. |
|
07 |
CAPITAL |
04/04 |
Conversion from single bottom
to double hull
Product Carrier (40,000 dwt). |
|
08 |
MANTINIA SHIPPING |
05/03 |
Conversion of double bottom to
double hull
Product Carrier (20,000 dwt). |
|
09 |
STELMAR |
03/03 |
Plan approval & Site team on behalf
of the Owner
for STX new buildings.
6 Handymax size Product/Chemical vessels. |
|
10 |
PITIOUSA |
10/02 |
Crane installation on a Container
ship.
Design of modification, plans review, stability,
calculations. |
|
11 |
TEMEKAV |
09/02 |
Design of a passenger vessel for
daily cruises.
|
|
12 |
STELMAR |
08/02 |
Plan approval & Site Team on behalf
of the Owner
for Daewoo new buildings.
5 Panamax size Crude/Product vessels. |
|
13 |
STELMAR |
03/02 |
Technical Memorandum appraisal for
Daewoo
New buildings (3 crude, 2 PC). |
|
14 |
TOMAZOS |
01/02 |
Structural Evaluation of a 100m RoRo
new building
and Evaluation of F.O. and D.O. System. |
|
15 |
TEMEKAV |
12/01 |
Design of eight
10m Tug Boats.
Design of two 20m Dry Cargo Barges. |
|
16 |
PITIOUSA |
11/01 |
Crane
installation on two Container ships.
Design of modification, plans review and attendance. |
|
17 |
STELMAR |
10/01 |
Plan Approval
for the Daewoo & Daedong new buildings
Tankers. |